Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 10/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
prestressed anchor for post-tensioning concrete
Definition of Parts:
Anchor head is the key part of bearing the prestressing tension, The round anchor head is made by 45# high-quality carbon construction steel, and the flat anchorage is made by 40Cr steel. Anchor head include round anchor head and flat anchor head
Wedge is the key part of anchor system, which is made by high-class alloy steel 20CrMnTi. Its form is divided into two-chip and three-chip. The system apply to the two-chip YJM15 series, it can be used for round anchorage, flat anchorage, but also used for porous coupler
Production Process:
1.Raw Materials---2.1.Raw Materials---3.Holes Cone Shaped Drilling---4.Holes Fine Turning---5.Peeling---6.Chamfering---7.Deburring & Chamfering---8.Quality Checking---9.Static Loading Test---10.paperbox---11.woodcase---12.ready for shipping
YJM System is consist of stress-end anchor, fixed-end anchor,anchor coupler and corrugated pipe. It can be divided into
YJM13,YJM15,YJM18 series of round anchors and BM13,BM15 series of flat anchors, we also have high-strength
steel wire YJM5,YJM7 series anchor.
Type | The number of PC strand root | Anchor plate | Bellows ID | Anchor ring | Spiral reinforcement | Anchor plate | Tension jack supporting models | ||
ΦAxBxΦD | ΦD | ΦExF | ΦGxΦHxL | Laps | Mounting hole Pitch | Mounting hole diameter | |||
YJM13-1 | 1 | 80x80xΦ10 | Φ39x43 | Φ70xΦ6x30 | 4 | YDC260Q | |||
YJM13-2 | 2 | 135x70xΦ58 | Φ50 | Φ73x45 | 100xΦ8x40 | 4 | 113 | M10 | YCW60B |
YJM13-3 | 3 | 135x70xΦ58 | Φ50 | Φ78x45 | 100xΦ8x40 | 4 | 113 | M10 | YCW60B |
YJM13-4 | 4 | 136x80xΦ62 | Φ55 | Φ88x47 | 130xΦ10x40 | 4 | 115 | M10 | YCW100B |
YJM13-5 | 5 | 136x80xΦ62 | Φ55 | Φ98x47 | 130xΦ10x40 | 4 | 115 | M10 | YCW100B |
YJM13-6 | 6 | 146x80xΦ62 | Φ55 | Φ103x45 | 140xΦ10x50 | 4 | 126 | M10 | YCW150B |
YJM13-7 | 7 | 146x80xΦ62 | Φ55 | Φ103x45 | 140xΦ10x50 | 4 | 126 | M10 | YCW150B |
YJM13-8 | 8 | 162x100xΦ78 | Φ70 | Φ117x50 | 160xΦ12x50 | 4 | 140 | M10 | YCW250B |
YJM13-9 | 9 | 176x120xΦ88 | Φ80 | Φ127x45 | 170xΦ14x50 | 5 | 153 | M10 | YCW250B |
YJM13-10 | 10 | 183x120xΦ90 | Φ80 | Φ137x45 | 180xΦ14x50 | 5 | 162 | M10 | YCW250B |
YJM13-11 | 11 | 210x120xΦ100 | Φ90 | Φ147x50 | 210xΦ14x60 | 5 | 180 | M10 | YCW250B |
YJM13-12 | 12 | 210x120xΦ100 | Φ90 | Φ147x50 | 210xΦ14x60 | 5 | 180 | M10 | YCW250B |
YJM13-13 | 13 | 210x140xΦ100 | Φ90 | Φ157x50 | 210xΦ14x60 | 5 | 185 | M10 | YCW350B |
YJM13-14 | 14 | 210x140xΦ100 | Φ90 | Φ157x50 | 230xΦ16x60 | 5 | 185 | M10 | YCW350B |
YJM13-15 | 15 | 234x160xΦ100 | Φ90 | Φ167x50 | 230xΦ16x60 | 5 | 200 | M10 | YCW350B |
YJM13-16 | 16 | 234x160xΦ100 | Φ90 | Φ167x55 | 230xΦ16x60 | 5 | 200 | M10 | YCW350B |
YJM13-17 | 17 | 234x160xΦ100 | Φ90 | Φ167x55 | 230xΦ16x60 | 5 | 200 | M10 | YCW350B |
YJM13-18 | 18 | 234x160xΦ100 | Φ90 | Φ167x60 | 230xΦ16x60 | 5 | 200 | M10 | YCW400B |
YJM13-19 | 19 | 244x180xΦ100 | Φ90 | 230xΦ16x60 | 6 | 210 | M10 | YCW400B |
Technical data
Prestressed Concrete Post Tensioning PC Steel Wire PT Anchor Wedges
1. YM15 applies to 15.2/15.24mm, 15.7mm pc strand.
2. YM13 applies to 12.7mm, 12.5mm & 12.9mm pc strand.
3. YM18 applies to 17.8mm pc strand.
4. YM22 applies to 21.6/21.8mm pc strand.
5. YM11 applies to 10.8mm pc strand.
6. YM10 applies to 9.3mm, 9.53mm pc strand.
7. YM7, YM6, YM5 apply to 7.0mm, 6.0mm, 5.0mm spiral ribbed pc wire
Application
----Prestressed Concrete Post Tensioning PC Steel Wire PT Anchor Wedges
----Prestressed Anchor system is a completed, independent building measure researched, it has been widely adopted by modern construction, especially used in pre-tension or post-tension for concrete constructions as building materials, such as bridge construction, railway and highway construction, buildings and channel construction, etc.
----It has been widely adopted by modern construction, especially used in pre-tension or post-tension for concrete constructions as building materials.